Crow Runner Link Manuale Utente Pagina 29

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 31
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 28
RUNNER LINK Gateway Installing the Receiver Server Configuration Program
16. Vide
o – for Video verification feature – currently not in used
17. Log Events – check the box to enable saving logs events operation,
create the folder name
18. Click the
button.
19. Connection with Central Station – select the communication media
connection
- If selected RS232, insert the correct COM port and the baud Rate
- If selected Network, insert the receiver server's IP address
- if selected Database , this is a JABLOTRON DB (MS-SQL) type , insert
all details of the DB server
19. Click the
button.
Remote
Work Station
26
Vedere la pagina 28
1 2 ... 24 25 26 27 28 29 30 31

Commenti su questo manuale

Nessun commento